Sunday, April 24, 2011

Playset!

We purchased the playset in early February, but it didn't arrive at our home until near the end of the month.  Patrick said he would just work on it in his "spare time", but in typical Patrick fashion, he finished it - COMPLETELY - this weekend.  The playset was started (the basic framework), base rock (4 yards) was hauled to the back (thanks to Jim, Martha, and Gerry for help!), the playset was finished, weed barrier was laid down, top rock (8+ yards) was hauled to the back (thanks to Gerry for help!), and a finishing border was installed - all in UNDER 2 months (with MANY other projects going on simultaneously)!


The first wheelbarrow of base rock (with Ryder's help!) being poured out - notice the framework for the base structure in the left of the picture.

Patrick reviewing his plan with Jim.

Ryder outside helping Patrick work on the playset (Ryder spent as much time as he possibly could outside!).

Taking a break from all the hard work.

Trying out the playset for the first time (obviously, still in the construction phase).

Ryder helping Patrick load a wheelbarrow with the second delivery of base rocks.

Completing the finishing touches.

The COMPLETED playset (notice Ryder peeking out with his orange balloon!)!!!

The playset turned out GREAT!!!  Ryder absolutely loves playing outside on it - of course, there are a few things he'll have to "grow into" (like the monkey bars and "bird's nest" above the swings), but he has a great time.  The top rocks we ended up getting for a great deal because the intended use is for chip sealing roads; however, it works perfectly for our purpose!

No comments: